In other to support and facilitate the procurement of raw material, production process and marketing/distribution, PT PETROKIMIA GRESIK did have at its disposal all sorts of support facility and infrastructure. They included the following :

I. Pier & Its Ancillaries

The pier for loading and unloading was 625 meters long and 36 meters wide. The pier was such as to enable 40,000 – 60,000 DWT ships to berth along its sea-bound side and another three of under 10,000 DWT ships along its land-bound side concurrently at any one time.
Is was equipped with a variety of loading/unloading facilities such as:
  • Continuous ship unloader, capable of unloading material in bulk, at a capacity of 1,000 tons per hour.
  • Multiple loading crane, capable of loading various kinds of end products in bulk at a capacity of 120 tons per hour as well as in 50-kg sacks at a capacity of 120 tons per hour.
  • 2 Kangaroo cranes, each capable of unloading bulk material at a capacity of 350 tons per hour.
  • Belt Conveyor; the Corporation possessed a system of belt conveyor, made up of 3 units with a total length of some 22 kilometers. These three belt conveyor units were, one for filling product into sacks at a capacity of 120 tons per hour and the other two for unloading raw material in bulk at a capacity of 1,000 tons per hour each.

II. Power Station

In other to ensure the supply of electrical power required for its production process and all other activities within its industrial compound, PT PETROKIMIA GRESIK hand 2 units of power station a its disposal:

  • Gas turbine generator, located at the nitrogen fertilizer production unit and capable of generating power 33 MW.
  • Steam turbine generator, located at the phosphoric acid production unit and capable of generating power 20 MW.
  • In addition to these two units of power station, the Corporation did also get power supply from the State-owned electricity company PLN, amounting to 15 MW, for some of its joint venture companies, lighting in its employee housing complex, hospital and other facilities.

III. Water Treatment Facility

The first unit to supply clean water required by the Corporation was located at Gunungsari Surabaya, taking in its raw water from the river Brantas. The clean water was subsequently pumped through a 14-inch diameter pipeline to Gresik at a distance of 22 Kilometers away. The treatment and subsequent pumping capacity of this Gunungsari plant stood at 720 cubic meters per hour.

The second water treatment unit could be found in Babat Lamongan, processing raw water from the river Bengawan Solo. The processed water was then pumped through a 28-inch pipeline to Gresik some 60 kilometers away. The treatment capacity of this Babat plant was 1500 cubic meters per hour but, if so required, its capacity could be stepped up to 2500 cubic meters hourly. 

News Index

 
  27 June 2008 11:18:17
Anggaran Pupuk Bersubsidi Tak Akan Dikurangi
 
  27 June 2008 11:07:45
Pupuk Tidak Ditambah
 
  25 June 2008 12:09:37
Revisi Permendag Distribusi Pupuk Siap Diberlakukan
 
  24 June 2008 08:23:37
Pembelian Pupuk Dicatat
 
  20 June 2008 09:25:29
Sistem Penyaluran dan Pengawasan Pupuk Bersubsidi Diperketat
 
Link URL

 

 

 

PT Petrokimia Gresik

©2002 PT Petrokimia Gresik